Human Resource Development Society

 

Projects


2012

Promotion of Social Inclusion through Accessible Water and Sanitation in Mansehra, Chitral (KPK) , and Shadadkot(Sindh)
Funding Agency Sight savers
Funding Period April 2012 to May 2014
Target Beneficiaries (persons) 2800
Interventions 1.Engage with local service providers and other stakeholders such as local CBOs and DPOs working at the community level through awareness raising workshops, consultative meetings etc. at district level for provision of accessible WATSAN services at communal places.
2.Develop a strong evidence base through collaboration with policy and research institute and get informed by global and national level learning and experiences in the field of accessible/adaptable WATSAN.
3.Demonstrate accessible WATSAN solutions at communal places and households in consultation with local communities and relevant stakeholders.
Total Cost Pak Rs. (Million) 600,350
Status On Goning 
 

Welcome to school Initiative ,FATA
Funding Agency UNICEF
Funding Period May 2012 to December 2012
Target Beneficiaries (persons) 1000 Students in 200 schools
Interventions 1.Rapid assessment for the identification of vulnerable children in targeted area.
2.advocacy and social mobilization of the key stakeholders on education promotion especially for female education.
3.Establish alternate learning spaces.
4.Provision of basic school supplies.
5.Transportation/distribution and monitoring of school supplies.
6.Mobility support to 80 non local female teachers to ensure their regularity.
Total Cost Pak Rs. (Million) 385
Status On Goning 
 

Welcome to school Initiative ,Swat
Funding Agency UNICEF
Funding Period May 2012 to Dec 2012
Target Beneficiaries (persons) 145 schools
Interventions 1.Teachers trainings.
2.Patent teacher committees.
3.Enrolment drive campaign.
4.Promoting inclusive education.
5.School health initiative.
6.Capacity Building of Education department.
Total Cost Pak Rs. (Million) 3.5
Status On Goning 
 

Early Recovery Restoration of Flood affected Communities in Tehsil/ District Naseerabad, Baluchistan
Funding Agency UNDP
Funding Period Dec 2011 To June 2012
Target Beneficiaries (persons) 5075 HH
Interventions 1.Capacity of local institutions & flood affected communities for recovery & protection of rights restore.
2.Livelihoods vulnerable flood affected people stabilize & restore.
3.Basic community infrastructure restored to strengthen & stabilize the livelihood of target communities.
Total Cost Pak Rs. (Million) 4.5
Status Completed  
 

Construction, Supervision & Monitoring of 1400, 1 room shelters in KN Shah, Dadu Sindh
Funding Agency UNOPS
Funding Period Jan 2012 to April 2012
Target Beneficiaries (persons) 15000
Interventions 1.Formation of CBO’s in the project villages, social mobilization for the verification of beneficiaries.
2.Signing of MOU’s between land loaner & beneficiaries.
3.Authorization to be obtained from Mukhtair Car Revenue officers of the Government before staring the physical work.
4.Collection of beneficiaries’ contribution before the starting physical work.
5.Handing over of constructed shelters to the beneficiaries according to the donor prescribed formats.
Total Cost Pak Rs. (Million) 37
Status Completed  
 

Improving Health Services through Participatory Governance
Funding Agency RAF
Funding Period Nov 2011 to July 2012
Target Beneficiaries (persons) 30000
Interventions 1.Joint venture with another local NGO OISD.
2.Review of SOP’s for DHMT’s.
3.Formation of women advocacy groups.
4.Focus group discussions, interviews with stakeholder, health department, local NGO’s, Media, Politicians & neglected segment of rural women.
5.A recommendation for the DHMT’s in the provincial health policies.
Total Cost Pak Rs. (Million) 7
Status Completed  
 

Maintenance of WASH facilities at Jalozai camp, District Charsadda, KPK
Funding Agency UNICEF
Funding Period Feb 2012 to July 2012
Target Beneficiaries (persons) 26530
Interventions 1.Handling 3 phases (iv, v, vi) holding 3790 families.
2.Installation and maintenance of 1448 latrines,681 bath places,359 water tanks,364 taps stand,68 laundry,72 solid waste points and 490 soakage pits.
Total Cost Pak Rs. (Million) 30.6
Status Completed  
 

Creating Access to Water and Sanitation Facilities to Improve the Living Condition of Persons with Disabilities, Mansehra District
Funding Agency Sight savers
Funding Period July 2010-Dec 2012
Target Beneficiaries (persons) 6,32,370
Interventions 1.Baseline study for assessment of major challenges of PWDs in relation to WatSan facilities in selected Union Councils.
2.Tehsil level training workshop for 200 community volunteers regarding disability issues and accessibility options.
3.One week technical training sessions for masons & VDCs (20 participants).
4.Construction of demo latrines and water facilities accessible by disabled persons.
5.Capacity building of PWDs, local community and service providers regarding technical barriers and their solution for accessible WatSan facilities.
6.Development of IEC material, including six monthly newsletter, pamphlets, brochures etc.
Total Cost Pak Rs. (Million) 4
Status Ongoing  
 

Welcome to School Campaign, Early Recovery Areas (District Swat)
Funding Agency UNICEF
Funding Period April 2011 toMarch 2012
Target Beneficiaries (persons) 26530
Interventions 1.Formation and capacity building of 139 PTCs.
2.600 teachers trained.
3.Provision of missing facilities to 75 schools under school development plan.
4.Rented buildings for 14 fully damaged schools.
5.15 Community Mobilization events.
6.30 Training sessions for teachers in 11 UCs.
7.25 SIP orientation session for PTCs.
8.School Supplies and Furniture for 139 Schools.
Total Cost Pak Rs. (Million) 49
Status Completed  
 

2011

Maintenance of WASH facilities at Jalozai camp, District Charsadda, KPK
Funding Agency UNICEF Peshawar
Funding Period Feb 2009 to July 2012
Target Beneficiaries (persons) 26530
Interventions 1.Handling 3 phases (iv, v, vi) holding 3790 families
2.Installation and maintenance of 1448 latrines,681 bath places,359 water tanks,364 taps stand,68 laundry,72 solid waste points and 490 soakage pits.
Total Cost Pak Rs. (Million) 30.6
Status  
 

Provision of WASH facilities in IDPs camp Naqi, FATA
Funding Agency UNICEF Peshawar
Funding Period Feb 2011 to August 2011
Target Beneficiaries (persons) 32868
Interventions Installation and maintenance of following hard activities;
1.1071 latrines
2.524 bath places
3.210 tanks
4.218 water tank stands
5.276 washing pad distribution
6.71 garbage points
Soft activities include;
7. 2918 hygiene sessions, distribution of 11244 hygiene kits istribution.2323 jerry can, 2253 soaps and 2314 buckets.
Total Cost Pak Rs. (Million) 28
Status completed 
 

Mass chlorination in 10 Districts of KPK
Funding Agency UNICEF
Funding Period June 2011 to August 2011
Target Beneficiaries (persons) 10 Districts
Interventions 1.Provision of technical support to PHED and TMA staff as necessary on chlorination to ensure safe water.
2.Ensuring and monitoring of the mass chlorination teams. Periodically monitoring of free chlorine in water resources and repetition of shock chlorination if required over the activity plan duration.
3.Insurance of chlorination of water tankers that are being used to transport water in the areas of AWD alert for safe drinking water.
4.Distribution of chlorine, aqua tabs, posters/brochures on safe drinking water as per need.
5.Suggestion of change of water resources which are microbiologically contaminated.
6.Deployment and management of the AWD response team to support the containment of the emergency.
7.Identify, constitute and Train a WASH AWD response team, comprising of HRDS. WHO, DCO, EDO, Health and health cluster partner and UNICEF/Cluster WASH IP.
Total Cost Pak Rs. (Million) 37
Status completed 
 

Provision of WASH facilities to flood affected Communities in District Dadu
Funding Agency ECHO
Funding Period March 2011 to June 2011
Target Beneficiaries (persons) 50,500
Interventions 1.Rapid Assessment
2.Provision of safe drinking water to flood affected population through tankers/ pipe.
3.connection of pour flush latrines.
4.Installation of hand pumps.
5.Provision of jerry cans and Hygiene kits.
6.Distribution of PUR sachets.
7.Installation of water tankers.
8.Conduct of Hygiene sessions including promotion of house hold water treatment methods and promotion of latrine usage.
9.Solid waste collection and installation of solid waste bins.
Total Cost Pak Rs. (Million) 32
Status completed 
 

Construction of Family Latrines and installation of hand pumps in flood affected UCs of District Bakkar, Layyah, Shikarpur and Shahdadkot
Funding Agency IRC
Funding Period Dec. 2010 To May. 2011
Target Beneficiaries (persons) 56,600
Interventions 1.Construction of 1346 pour flush latrines.
2.Installation of 900 hand pumps.
3.Disinfection of drinking water sources in flood affected UCs of Shikarpur, Shadadkot, Layyah & Bhakkar.
Total Cost Pak Rs. (Million) 56
Status completed 
 

Provision of water and hygiene facilities to flood affected communities in Mirpurkhas
Funding Agency HRDS
Funding Period Oct 2011 To Dec 2011
Target Beneficiaries (persons) 20,410
Interventions 1.Rapid Assessment of flood affected areas.
2.Provision of Safe drinking water through water tinkering.
3.Distribution of NFI’s, pure sachet & aqua tabs, hygiene sessions.
4.Coordination with WASH cluster & line department.
Total Cost Pak Rs. (Million) 4
Status completed 
 

Welcome to School Campaign, Early Recovery Areas (District Swat)
Funding Agency UNICEF
Funding Period April 2011 to Dec 2011
Target Beneficiaries (persons) 20,410
Interventions 1.Formation and capacity building of 139 PTCs.
2.600 teachers trained.
3.Provision of missing facilities to 75 schools under school development plan.
4.Rented buildings for 14 fully damaged schools.
5.15 Community Mobilization events.
6.30 Training sessions for teachers in 11 UCs.
7.25 SIP orientation session for PTCs.
8.School Supplies and Furniture for 139 Schools.
Total Cost Pak Rs. (Million) 37
Status completed 
 

Assessment and provision of missing facilities in schools of Malakand division
Funding Agency UNICEF
Funding Period April 2011 to Dec 2011
Target Beneficiaries (persons) 1027 schools
Interventions 1.Assessment of missing supplies .
2.Provision of missing facilities.
Total Cost Pak Rs. (Million) 37
Status completed 
 

Monitoring of WASH services provided by IPs of UNICEF in Sindh, Baluchistan, KAP, Gilgit and FATA
Funding Agency UNICEF
Funding Period January 2011-june 2011
Target Beneficiaries (persons) 40 IPS
Interventions 1.Monitoring of WASH services provided by 40 IPs of UNICEF different regions of in Sindh, Baluchistan, KAP, Gilgit and FATA
Total Cost Pak Rs. (Million) 15
Status completed 
 

Creating Access to Water and Sanitation Facilities to Improve the Living Condition of Persons with Disabilities, Mansehra District
Funding Agency Sight savers
Funding Period July 2010-Dec 2012
Target Beneficiaries (persons) 6,32,370
Interventions 1.Baseline study for assessment of major challenges of PWDs in relation to WatSan facilities in selected Union Councils.
2.Tehsil level training workshop for 200 community volunteers regarding disability issues and accessibility options.
3.One week technical training sessions for masons & VDCs (20 participants).
4.Construction of demo latrines and water facilities accessible by disabled persons.
5.Capacity building of PWDs, local community and service providers regarding technical barriers and their solution for accessible WatSan facilities.
6.Development of IEC material, including six monthly newsletter, pamphlets, brochures etc.
Total Cost Pak Rs. (Million) 4
Status completed 
 

Drought Mitigation & preparedness Project (DMPP-II) construction of 101 rainwater harvesting schemes (rain harvesting ponds, delay action dams, check dams, dug wells, pipe Irrigation, water courses lining, diversion bunds)
Funding Agency PPAF
Funding Period Jan 2010 to Dec 2011
Target Beneficiaries (persons) 25000
Interventions Construction of 101 rainwater harvesting schemes (rain harvesting ponds, delay action dams, check dams, dug wells, pipe Irrigation, water courses lining, diversion bunds)
Total Cost Pak Rs. (Million) 2.6
Status completed 
 

Capacity Building PPAF III, training of COs on project cycle management and skill development
Funding Agency PPAF
Funding Period Jan 2010 to Dec 2011
Target Beneficiaries (persons) 1395
Interventions Capacity Building of COs on project operation & maintenance, CMST, LMST, Record Keeping & financial management, Health & Hygiene and Disaster preparedness
Total Cost Pak Rs. (Million) 43.6
Status completed 
 

Social mobilization PPAF-III
Funding Agency PPAF
Funding Period June 2010 to Dec 2011
Target Beneficiaries (persons) 43000
Interventions Formation 96 COs in one union council of DG Khan and their capacity building
Total Cost Pak Rs. (Million) 1.2
Status completed 
 

Improving Health Services through Participatory Governance Project
Funding Agency RAF
Funding Period Nov 2011 to July 2012
Target Beneficiaries (persons) Mahnsera District
Interventions 1.Joint venture with another local NGO OISD.
2.Review of SOP’s for DHMT’s.
3.Formation of women advocacy groups.
4.Focus group discussions, interviews with stakeholder, health department, local NGO’s, Media, Politicians & neglected segment of rural women.
A recommendation for the DHMT’s in the provincial health policies.
Total Cost Pak Rs. (Million) 7
Status completed 
 

2010

Maintenance of WES facilities at Jallozai camp 3rd Quarter 2010
Funding Agency UNICEF Peshawar
Funding Period July 2010 to Jun 2011
Target Beneficiaries (persons) 29000
Interventions 1. Repair & Maintenance of 1,616 VIP latrines in Phase 11,12, 18,19,20) , 795 Bathing Places, 502 washing/laundry places, 407 Storage Tanks & stand posts, 98 Solid Waste Disposal Points, Tube wells M&R
2. Cleaning of camp and WES facilities installed in the camp
3. Repair of damages if caused during windstorms, will be utilized upon written approval from UNICEF
4. Training of 70 community activist on CLTS, 2 x 4 days trainings, 35 participants per training.
5. Hygiene promotional activities and hygiene training sessions in the camps
Total Cost Pak Rs. (Million) 30.6
Status  
 

Design, construction supervision and certification of Drinking Water facilities in 651 schools of earthquake affected areas in AJK and Khyber Pakhtunkhwa
Funding Agency UNICEF Islamabad
Funding Period May 2010 to Dec 2011
Target Beneficiaries (persons) 101200
Interventions 1. Design report including BOQs/cost estimates including requirement of supplies for each of the 649 schools
2. Report on water quality testing (E-coli) and remedial measures in schools where high bacteriological risk is assessed at the source
3. Certification reports of the physical works in 649 target schools
4. Completion certificates for 649 schools
5. Digital Photographs with captions for all project interventions
Total Cost Pak Rs. (Million) 8.1
Status  
 

Welcome to School Campaign” Early Recovery Areas (District Swat).
Funding Agency UNICEF Peshawar
Funding Period June 2010 to Apl. 2011
Target Beneficiaries (persons) 221800
Interventions 1. Pre-interventions assessment of 298 target schools including 255 primary & 43 middle schools in 11 selected union councils of Swat district
2. Pre and Post Base line survey, Community Mobilization and advocacy for girls & boys enrolment in 298 schools in 11 union councils of swat, 25 community mobilization events will be organized, 02 at least 02 at unioncouncil level.
3. Formation of 298 parent teacher councils (PTCs) their reactivation, Capacity Building ,strengthening and training of their roles and responsibilities
4. 119, 2day Training sessions for PTCs and 119, one day refreshers for the PTCs
5. Training of 578 teachers (M+F) on school development plan, psycho social support, MRE, peace education and disaster risk management. 29, 5 days Training sessions for teachers.
6. Provision of missing facilities under school development plan 75 schools which includes 60 primary schools & 15 middle schools will be developed based on the need assessment.
7. Post-interventions assessment of 298 targeted schools after the completion of project interventions to evaluate the success of the project.
Total Cost Pak Rs. (Million) 31.8
Status  
 

Provision of Water, Sanitation and Hygiene Facilities in Schools in Early Recovery Areas (District Swat).
Funding Agency UNICEF Peshawar
Funding Period May to July 2010
Target Beneficiaries (persons) 45000
Interventions 1. Installation/rehabilitation of 120 latrines
2. Installation of 60 washing points for hand washing.
3. 30 Hand Pumps on Boreholes (80 to 100 rft) with at least 20 rft water column will be installed in those school where no existing water source available in nearby or only have open wells which are not hygienically safe.
4. Rehabilitation of Water supply through Piped water supply in 30 schools.
5. Installation of 60 solid waste bins.
Total Cost Pak Rs. (Million) 8.3
Status  
 

Social Mobilization PPAF III
Funding Agency PPAF
Funding Period June 2010 to Dec 2011
Target Beneficiaries (persons) 16500
Interventions Formation 96 COs in one union council of DG Khan and their capacity building
Total Cost Pak Rs. (Million) 2.6
Status  
 

Capacity Building -PPAF III
Funding Agency PPAF
Funding Period Jan 2010 to Dec 2011
Target Beneficiaries (persons) 900
Interventions Capacity Building of COs on project operation & maintenance, CMST, LMST, Record Keeping & financial management, Health & Hygiene and Disaster preparedness
Total Cost Pak Rs. (Million) 1.2
Status  
 

Drought Mitigation & preparedness Project (DMPP)
Funding Agency PPAF
Funding Period Jan 2010 to Dec 2011
Target Beneficiaries (persons) 45000
Interventions Line of 20 water courses, Construction of 50 rain water harvesting ponds, 10 check dames & 03 delay action dams, 10 pipe irrigation schemes, Beneficiaries are 3000 families
Total Cost Pak Rs. (Million) 43.4
Status  
 

2009

Construction of Shelters and Latrines at UC Sultan Vas - Buner
Funding Agency UN - Habitat
Funding Period Sept to Dec 2009
Target Beneficiaries (persons) 1,200
Interventions 1. Construction of 150 shelters
2. Construction of 50 latrines
Total Cost Pak Rs. (Million) 0.6
Status  
 

Promoting social inclusion with reference to PWDs in internally displaced persons crisis NWFP Province
Funding Agency Sight Savers International
Funding Period Sept to Dec 2009
Target Beneficiaries (persons) 65,000
Interventions 1. 06 modern wash rooms accessible to disabled persons constructed in Jalozai camp.
2. 02 water supply scheme installed.
3. 65,000 population screened for visual impaired people.
4. 1500 goggles distributed to visually impaired persons.
5. 1000 hygiene kits distributed
Total Cost Pak Rs. (Million) 1.4
Status  
 

Water Quality Improvement and promotion of Hygiene (WAQIPH-I &II) Project
Funding Agency UNICEF AJK
Funding Period May, 2009 to Dec, 2009
Target Beneficiaries (persons) 200,000
Interventions 974 Water Supply Schemes were mapped and source protection design developed to ensured the provision of Safe Drinking Water to the Beneficiaries
Total Cost Pak Rs. (Million) 9.7
Status  
 

Project cycle Management (PCM ) in 02 Districts of Faisalabad, Chak Jhumra and Jaranwala
Funding Agency DTCE
Funding Period March, 2009 to December 2009
Target Beneficiaries (persons) 185,000
Interventions 282 CCB members of 47 CCBs were trained on Project Cycle Management
Total Cost Pak Rs. (Million) 5.0
Status  
 

Facilitating the health department for mother and new born babies
Funding Agency PAIMAN
Funding Period May, 2009 to April, 2010
Target Beneficiaries (persons) 300,000
Interventions 1. Community awareness/ advocacy events for mother and new born. Establishment of Birthing centre
Total Cost Pak Rs. (Million) 6.6
Status  
 

2008

Second Generation Interventions for Sustainable Rural Development in DMPP Project area DG Khan Dist
Funding Agency PPAF
Funding Period August 2008 to June 2009
Target Beneficiaries (persons) 27000
Interventions 250 community representatives were trained on modern farming techniques
Total Cost Pak Rs. (Million) 7.693
Status  
 

Provision of WES facilities in the 06 IDP Camps (Kacha Garhi, Jalozai, Sugar Mill Charsadda, Sakha Kot, Palosa and Chota Lahore camp)
Funding Agency UNICEF Peshawar
Funding Period August 2008 to Sep. 2009
Target Beneficiaries (persons) 80000
Interventions 1. 1957 VIP Latrine Constructed
2. 981 bathing Constructed
3. 448 water collection points Constructed & water storage tanks installed
4. 845 hand washing places developed
5. 157 cloth washing places constructed
6. 101 solid waste collection points constructed
7. 02 deep wells installed
8. 0.6 million gallon water supplied on daily basis
9. 6412 Buckets, 5500 Hygiene Kit
10. 5610Jeri Can, 5300 Waste Bin, 15000 Toilet Soap, 15000 Washing soap, 8000 Brooms were distributed
Total Cost Pak Rs. (Million) 200
Status  
 

Water Quality Monitoring, Surveillance & Development of Database
Funding Agency LG & RDD, AJK
Funding Period August 2008 to Nov. 2008
Target Beneficiaries (persons) 150,000
Interventions 1- 700 drinking water supply schemes were tested for 26 water quality parameters.
2- 400 community representatives and local government officials were trained on water sampling & testing.
3- Water quality maps were made by using SIG techniques
Total Cost Pak Rs. (Million) 11.753
Status  
 

Training of COs, on HESA AJK LG, Muzaffarabad
Funding Agency LG & RDD, AJK
Funding Period June to August 2008
Target Beneficiaries (persons) 80,000
Interventions 310 CBOs and 1100 members were trained on HESA
Total Cost Pak Rs. (Million) 4.75
Status  
 

Provision of WES & Education facilities in Primary Schools of FATA
Funding Agency UNICEF Peshawar
Funding Period June 2008 to Dec 2008
Target Beneficiaries (persons) 150,000
Interventions 1- 100 PTAs formed
2- Latrines & water supplies provided in target schools after need assessment in 100 school
3- 100 teachers and 200 PTA members trained on operation & maintenance of WES facilities and hygiene promotion
Total Cost Pak Rs. (Million) 4.88
Status  
 

Arsenic Monitoring & Mitigation in DI Khan
Funding Agency UNICEF Peshawar
Funding Period June 2008 to Dec 2008
Target Beneficiaries (persons) 85,000
Interventions 1- 10,000 Water source screened for Arsenic Contamination
2- 100 local representatives trained on water testing
3- 10 ARTs (community based arsenic removal) filters installed
4- 02 community based Deep boring Water supply scheme installed for arsenic free drinking water
Total Cost Pak Rs. (Million) 3.16
Status  
 

Rehabilitation of Water supplies in Mansehra
Funding Agency UNICEF Abbotabad
Funding Period June 2008 to September 2008
Target Beneficiaries (persons) 25000
Interventions 1- 11 rural drinking water supplies rehabilitated with the community participation.
2- 55 WES committee members trained for operation and maintenance
Total Cost Pak Rs. (Million) 11.83
Status  
 

WES Project District R Y Khan, Bahawalpur, Sheikhupura and Kasur. Punjab
Funding Agency UNICEF Punjab
Funding Period May 2008 to Dec 2008
Target Beneficiaries (persons) 250,000
Interventions 1- 30,000 Water source screened for Arsenic Contamination
2- 10,000 water sources tested for fluoride contamination
3- 300 local representatives trained on water testing
4- 100 ARTs (community based arsenic removal) filters installed
5- 09 community based Deep boring Water supply scheme installed for arsenic free drinking water
Total Cost Pak Rs. (Million) 20.0
Status  
 

2007

Pakistan Safe Drinking water & hygiene Promotion Project,
Funding Agency Abt. Associates
Funding Period Nov. 2007-April 2009
Target Beneficiaries (persons) 160,000
Interventions 300 Families per Tehsil trained on Safe Drinking water usages, capacity building of community and TMA staff was done along with advocacy & social mobilization events in target Tehsils
Total Cost Pak Rs. (Million) 6.60
Status  
 

Training of COs, on HESA AJK LG, Muzaffarabad
Funding Agency LG & RDD, AJK
Funding Period August 2007 to Dec. 2007
Target Beneficiaries (persons) 115,000
Interventions 310 CBOs and 1700 members were trained on HESA
Total Cost Pak Rs. (Million) 4.8
Status  
 

Consumer Survey of WASA Rawalpindi
Funding Agency WASA Rawalpindi
Funding Period August 2007 to Dec 2007
Target Beneficiaries (persons) 420,000
Interventions Hose hold survey of 70000 WASA Consumer was done
Total Cost Pak Rs. (Million) 1.8
Status  
 

Ministry of Industries, Production & Special Initiative
Funding Agency CDWA
Funding Period April to June 2007
Target Beneficiaries (persons) 170,000
Interventions 202 water filtration plants installed under CDWI in Punjab, Sindh, AJK & NA were Validated
Total Cost Pak Rs. (Million) 2.98
Status  
 

Drought Mitigation & preparedness Project (DMPP)
Funding Agency PPAF
Funding Period July 2007 to June 2009
Target Beneficiaries (persons) 27000
Interventions Line of 10 water courses, Construction of 60 rain water harvesting ponds, 11 check dames & 02 delay action dams, 07 pipe irrigation schemes, 03 open wells were completed
Total Cost Pak Rs. (Million) 43.64
Status  
 

Devolution Project for Community Empowerment (DTCE) in Faisalabad
Funding Agency DTCE
Funding Period Mar 07 to August 07
Target Beneficiaries (persons) 150,000
Interventions 215 CCB members of 38 CCBs were trained on Project Cycle Management
Total Cost Pak Rs. (Million) 0.70
Status  
 

Improving Access in Quality of Primary Education in Khyber Agency, NWFP
Funding Agency UNICEF NWFP
Funding Period Jan 2007 to December 2007
Target Beneficiaries (persons) 150,000
Interventions 1. 100 PTAs formed
2. 200 PTA members & 100 teaches trained on child friendly school & school development
Total Cost Pak Rs. (Million) 1.85
Status  
 

WES Project District R Y Khan, Bahawalpur, Sheikhupura and Kasur. Punjab
Funding Agency UNICEF Punjab
Funding Period April 2007 to December 2007
Target Beneficiaries (persons) 400,000
Interventions 1. 85,000 Water source screened for Arsenic Contamination
2. 60,000 water sources tested for bacterial contamination
3. 600 local representatives trained on water testing
4. 100 ARTs (community based arsenic removal) filters installed
5. A community based Deep boring Water supply scheme installed for arsenic free drinking water
Total Cost Pak Rs. (Million) 13.31
Status  
 

2006

School WES Campaign at FATA, NWFP
Funding Agency UNICEF NWFP
Funding Period June 2006-August 2007
Target Beneficiaries (persons) 130,000
Interventions 1. 90 PTAs formed
2. Latrines & water supplies provided in target schools after need assessment in 90 school
3. 90 teachers and 180 PTA members trained on operation & maintenance of WES facilities and hygiene promotion
Total Cost Pak Rs. (Million) 12.76
Status  
 

Gender Justice Project through Masalihat Anjuman Project in District Attock
Funding Agency UNDP
Funding Period August 2006-to February 2007
Target Beneficiaries (persons) 150,000
Interventions 1. 600 local representatives sensitized
2. More than 2 lac person were award on Masalihat Ajjuman
Total Cost Pak Rs. (Million) 1.44
Status  
 

Water Quality, Monitoring, in Layyah
Funding Agency CIDA
Funding Period August 2006-to July 2007
Target Beneficiaries (persons) 100000
Interventions 1. 10000 water sources tested for arsenic and bacterial contamination.
2. 400 local representatives trained on water quality monitoring and mitigation
3. Water testing laboratory established in TMA Layyah
Total Cost Pak Rs. (Million) 5.24
Status  
 

CPI Project, at D.G.Khan
Funding Agency PPAF
Funding Period April 2006 to June 2007
Target Beneficiaries (persons) 15000
Interventions 1. 140 COs formed 2. 140 differed natured community infrastructure projects completed.
Total Cost Pak Rs. (Million) 20.13
Status  
 

WES Project District R Y Khan, Bahawalpur, Sheikhupura and Kasur. Punjab
Funding Agency UNICEF Punjab
Funding Period Jan 2006 to Dec 2006
Target Beneficiaries (persons) 320000
Interventions 1- 60,000 Water source screened for Arsenic Contamination
2- 40,000 water sources tested for bacterial contamination
3- 400 local representatives trained on water testing
4- 87 ARTs (community based arsenic removal) filters installed
5- 300 house hold arsenic filters installed
Total Cost Pak Rs. (Million) 18.34
Status  
 

Primary Education/ WES in Khyber Agency, NWFP
Funding Agency UNICEF NWFP
Funding Period June 2006 to Dec 2006
Target Beneficiaries (persons) 13500
Interventions 90 teaches trained on child friendly school & school development
Total Cost Pak Rs. (Million) 1.52
Status  
 

Back to School WES campaign Earth Quake
Funding Agency UNICEF Abbotabad
Funding Period 2006
Target Beneficiaries (persons) 60,000
Interventions 400 & 800 teaches trained on child friendly school & school development
Total Cost Pak Rs. (Million) 32.42
Status  
 

2005

WES Programme in JABA, Ghazikot and Nawaz Shairf Camps, District Mansehra
Funding Agency UNICEF Mansehra
Funding Period 2005
Target Beneficiaries (persons) 13000
Interventions 1. 200 VIP latrines, 100 bathing places and 20 washing places constructed
2. 60 WES committees formed
3. 400 hygiene sessions conducted
4. 1170 million gallon water supplied
Total Cost Pak Rs. (Million) 9.5
Status  
 

Community Physical Infrastructure Projects, at D.G.Khan
Funding Agency PPAF
Funding Period Jan 2005 to Dec 2005
Target Beneficiaries (persons) 14000
Interventions 1. 100 COs formed
2. 100 differed natured community infrastructure projects completed.
Total Cost Pak Rs. (Million) 10.33
Status  
 

WES Project District R Y Khan, Bahawalpur, Sheikhupura and Kasur. Punjab
Funding Agency UNICEF Punjab
Funding Period Jan 2005 to Dec 2005
Target Beneficiaries (persons) 145000
Interventions 1- 25000 Water source screened for Arsenic Contamination
2- 160 community representatives trained for water testing
3- 600 teacher trained for hygiene promotion
4- 200 LHW/LHVs trained for hygiene promotion
Total Cost Pak Rs. (Million) 5.00
Status